Laserfiche WebLink
' use v-scs <br />SC S~C ON S-fib <br />nev vnz <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />r <br /> <br /> <br />1 <br /> <br /> <br />RECORD OF COOPERATOR'S DECISIONS <br />ANO PROGRESS IN APPLICATION <br />EIBIT I/J (Cont'd) _ <br />COOPERATOR ValCO. IriC. <br />ASSISTED BY n Rerl i n~er <br />DATE June 7 6 1977 <br /> PLANNED APPLIED <br />FIELD MONTH LAND USE AND TREATMENT <br />N0. AMOUNT YEAR AMOUNT ANO <br /> YEAR <br /> LOCATION: <br /> Valco, Inc, plans to expand the size of the <br /> existing Rocky Ford East Pit as indicated on <br />I the plan map. The area to be affected covers <br /> approximately 45 surface acres and is part o£ <br /> Valco's surface mining operation to obtain <br /> Band and gravel. This pit area is located <br /> approximately 2 miles south east of Rocky <br /> Ford on IIS Highway 50, in the NE1 of the NE? <br /> and in the Ez of the N6J4 of the NF4 of Sec.21 <br /> T23S R56W. <br /> LAND STATIIS <br /> All the land on the pit area is owned by <br /> Valco, Inc.; Earl J. Brubaker, President and <br /> Frank Jobe, Excutive Vice President. <br /> LAND IISE: <br /> The primary land use after reclamation will <br /> be recreation land and wildlife land will be <br /> a secondary land use. <br /> CONSERVATION TREATMIIEPITT IINIT N0. 1 <br /> RECREATION, LDLIFE LAND - Field 1 <br /> Begin <br />1 45 Acres 197'$ RECREATION AREA IND?ROVEMEPPP: <br /> Recreation area improvement will be carried <br /> out in order to increase the attractiveness <br /> and usefulness of this field for recreation <br /> while protecting the soil and plant resources. <br /> The planting of grasses, legumes, flowering <br /> plants, shrubs and trees which will enhance <br /> the area for aesthetical and recreational <br /> values will be carried out as set forth under <br /> Critical Area Planting. All new plantings <br /> will be protected from fire and grazing. <br /> Cultivation will be timely and frequently <br /> enough to keep tree and shrub plantings free <br /> o£ competitive weeds. Replanting of trees <br /> and shrubs which do not survive the first <br /> year should be made the following year. <br />22 <br />