My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135187
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:55 PM
Creation date
11/26/2007 3:10:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/11/2006
Doc Name
TOC To End of Report (Geotechnical Engineering Study, Gob Pile, 11/10/03)
Section_Exhibit Name
Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Inspection <br />The waste rock disposal area will be inspected for stability by a qualified <br />registered engineer or other qualified professional specialist experienced in <br />construction of earth and rockfill embankments under the direction of a qualified <br />professional engineer, on a quarterly basis, beginning within 7 days after the <br />preparation of the disposal area begins. In addition the area will be inspected <br />during the following critical periods: removal of all organic material and topsoil as <br />previously described, placement of underdrainage systems, installation of <br />surface drainage systems, placement and compaction of fill materials, and <br />during revegetation. Inspections shall include such observations and tests as <br />may be necessary to evaluate the potential hazard to human life and property, to <br />ensure that all organic material and topsoil have been removed and that proper <br />construction and maintenance are occurring in accordance with the approved <br />plan. A report will be provided to the Division by the inspecting engineer within <br />two weeks of the completed inspections. A copy of this report will be kept at the <br />mine site. <br />• The certified report addressing the underdrain system and protective filters will <br />include color photographs taken during and after construction, but before <br />underdrains are covered with excess spoil. If the underdrain system is <br />constructed in phases, each phase shall be certified separately. The color <br />photographs accompanying each certified report will be taken in adequate size <br />and number with enough ten-ain or other physical features of the site shown to <br />provide a relative scale to the photographs and to specifically and clearly identify <br />the site. <br />TR-43 - 10 - 05/06 <br />A PP~eovED <br />y/ll/0 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.