My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135180
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:55 PM
Creation date
11/26/2007 3:10:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993080
IBM Index Class Name
Permit File
Doc Date
3/3/1994
Doc Name
CALHAN PIT FN M-93-080 SUMMIT BRICK & TILE
From
LLOYD V BUCK BARNHART
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'94-03-08 10 52 PUEBLO TITLE <br />a • • <br />Lloyd V. "Buck" Barnhart <br />S sedum Court /Pueblo. Colorado 81001 <br />Otlice: (719) 5431324 /Rome: (719) 542.9207 <br />March 8, 1994 <br />Fax: (3031 832-8106 <br />Mr. Bob Oswaltl <br />Division of Minerals & Geology <br />1313 Sherman Street, Room 215 <br />Denver, Ca. 80203 <br />Re: Calhan Pit - File No. M-93-OBO <br />Summit Brick E, Tile <br />Dear Bob: <br /> <br />Here are the Stems we discuas~d ywstertlay to clear up ad- <br />equacy on this application: <br />U~ ~~ ~I <br />pp ~, 1 . Operator will leave a 200' setba_c_k_ north of the power <br />Y~ lines. <br />~'(`w~w ( 2. A 200" setback will be left from the east end of the <br />~~U^^' County Bridge on the road south of the permit area. <br />~~ Berms will be installed on the south perimeter of Phases <br />II and III. <br />~,4,~h^,i` ' 4. In Phase III, overburden will form Lhe buffer on the <br />JJf oi.w south side. Topsoil will-be s~ckpiledparallel to and <br />l~ immediately downhill from the overburden stockpiles. <br />~~ ~`p-f 5 Portable t~ ets will be leased from antl serviced by an <br />~ independent contractor. Potable water will be hauled to <br />\ --- the site by employees when working. <br />~~~~~ ~ 6. One Acrs+ in Phase II will be left on the south perimeter, <br />~~aw north of the berm as a_haul road far traffic from Phase <br />III. This will leave 9 acres fo be affected at one time <br />'Q~o(, in Phase III. This haul road will be reclaimed in final <br />~ ,niwi.~, reclamation. <br />Contact me if there are ocher questions. <br />Cordially, <br />Lloyd V. "Buck" Barnhart <br />Consultant k Agent <br />Summit Brick 6 Tile Co. <br />cc: Summit 6 Geddes <br />
The URL can be used to link to this page
Your browser does not support the video tag.