Laserfiche WebLink
STOUT-AMICK PIT <br />EXHIBIT E--RECLAMATION PLAN <br />PIT RECLAMATION. <br />AS STATED IN PHASE NO. ~ MINING PLANS OVERBURDEN WILL BE PLACED OVER <br />THE PIT AREA, SLOPES CONSTRUCTED TO NOT STEEPER THAN 3:I AND TOPSOIL PLACED <br />UNIFORMLY OVER THE PIT AREAS. PHASE ONE CAN BE RECLAIMED AFTER OPERATIONS <br />ARE COMP LETEO WITHIN ITS AREA HOWEVER PHASE Z AND 3 CANNOT BE RECLAIMED <br />UNTIL PHASE 3 IS EXHAUSTED SINCE THE ONLY PLACE TO STOCKPILE OVERBURDEN AND <br />TOPSOIL FROM PHASE 3 IS IN PHASE Z THEREBY RE OUIRING THAT PHASES Z AND 3 BE <br />SEEDED AND FINALLY RECLAIMED A7 THE SAME TIME. <br />$TOCKPILE AND PLANT AREA. <br />TERRACES CONSTRUCTED FOR STOCKPILE AND PLANT LOCATIONS MILL BE OBLITER- <br />ATED BY PLACING THE FILL GENERATED BY EXCAVATING THE TERRACES BACK INTO THE <br />TERRACE EXCAVATION AREA. HOWEVER NO SLOPE RECONSTRUCTED WILL BE STEEPER <br />THAN 3: ~. THE TOPSOIL STOCKPILED IN THE NORTH 2 OF THE STOCKPILE AND PLANT <br />AREA MILL BE REPLACED OVER THE REBUILT AREAS AND ALL AREAS MILL BE SEEDED <br />AS RECOMMENDED BY SCS. <br />MAIN ACCESS ROADS TO THE PLANT AREA AND THE EXHAUSTED GRAVEL PITS MILL <br />REMAIN AND NO7 BE RECLAIMED. THIS IS TO PROVIDE OPERATIONAL AND MAINTENANCE <br />ACCESS TO THE PERMIT AREA. <br />