My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135049
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:47 PM
Creation date
11/26/2007 3:02:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981275
IBM Index Class Name
Permit File
Doc Date
11/1/1981
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STOUT-AMICK PIT <br />Exhibit D--Mining Plan <br />Acr_ess Roads will be construr_ted to stockpile area, plant Bite <br />and Pit Area Phase 1 approximately as shown, <br />Stockpile area and plant site will be stripped of topsoil <br />(approx. 6" deep). This topsoil will be stockpiled in the <br />northerly ~ of the stockpile and plant area. The stockpile and <br />plant area will be graded by terraces to accomodate stock piles <br />and plant or plants in the southerly ~ of the stockpile-plant area <br />only. Slopes on terraces and topsoil stockpiles will not be <br />steeper than 2:1. <br />Pit area phase #1 will be stripped of topsoil (approximately <br />12" deep) and overburden (another 4 feet deep) which will be <br />stockpiled seperately in pit area phase 2. The gravel in phase <br />one will be excavated from north to south and since this pit <br />location is on a mesa top, an undisturbed area of approximately 40 <br />feet wide will be left along the westerly and southerly sides <br />of the pit as a natural site and sound screen of the operations, <br />It is assumed that phase one area will provide approximately S <br />years supply of gravel at 40,000 tons per year. <br />After phase one has been <br />replaced over the area, sides <br />3:1 and covered with topsoil. <br />along the north edge of the p <br />Grass seed will be sown on th <br />recommended by SCS. <br />exhausted, the overburden will be <br />will be sloped not steeper than <br />Of course a roadway must be left <br />ease to provide access to Phase 2. <br />reclaimed portion of Phase 1 as <br />Phase No. 2 will be stripped and the topsoil and overburden <br />will be stockpiled seperately in Phase No, 3. Mining plan will <br />follow that for Phase No, 1 leaving an access road along the <br />north edge of the pit. <br />Phase No, 3 will be stripped and <br />will be stockpiled seperately in Phase <br />will follow that for phases 1 and 2. <br />the topsoil and overburden <br />No. 2, The mining plan <br />~~: ~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.