Laserfiche WebLink
elevatior. of the P.iver to the west and will shocv gravel <br />thickness to be remove3 and the pit bottom elevation. <br />Gravel will then be removed using rubber tire3 and tracked <br />loaders and trucks. Peck expects tc mine approximately one <br />acre each year, but this will vary according to the <br />thickness of gravel available. <br />All banks will be mined at a 3:1 slope. This includes <br />the pit side banks of the protective berm. The actual pit <br />will be mined so as to slope back tcwards the River at a 1 <br />foot ir. 5C0 feet rate (see cross secticn;. It will also be <br />sloped to the northwest at a rate of 1 foot ir. BO feet, <br />which is the same slope as the River. This will leave the <br />pit bottom in its reclaimed configuration as .,,~nirg ~~ <br />completed. <br />The Uncompahgre River slopes to the northwest at an <br />average rate of 1 foot in °0 feet across the proposed pit <br />area. It does vary from as low as 1 foot ir. 120 feet to as <br />steep as 3 feet in lOC feet. <br />4. RECLAMATION PLAN: <br />Deer. elk and small game are abundant throughcut the <br />general area. The present land use consists of deer and elk <br />migrating across the gravel bar to drink from the River. <br />Many deer and elk winter in the general area. The actual <br />pit site is nearly void of vegetation so little, if any, <br />grazing occurs in this area. The area adjacent to the pit <br />on the east side is foraged during the fall, winter and <br />spring. None of this area will be disturbed by the proposed <br />cperation. Flhen the pit is completed, the bar will remain <br />essentially flat with 3:1 slopes, which will not inhibit the <br />wildlife (see cross section). <br />Reclamation of the site will be an ongoing project. As <br />the gravel is mined, the bottom of the pit will be left in a <br />near flat conditicn (slightly dipping west and northwest). <br />When the entire pit is completed, minor grading may be <br />needed but should take less than one day to complete. <br />Peck estimates that reclamation will occur in one acre <br />sections from south to north behind the actual mining <br />operation. This will depend on how much gravel is mined <br />each year. Some reclamaticn will occur each year, depending <br />on the amount of gravel removed. <br />Cost estimates are difficult tc determine, as most of <br />the costs will be a part cf the mining. Final grading of <br />the area, using a D-5 Cat should take 10 hours at $50.00 per <br />hour, totaling $500.00, plus seed and fertilizer if <br />necessary. Total reclamation of the project will be <br />completed withir. two months after all the gravel has been <br />mined from the pit. <br />According to °en Miller, Colorado Wildlife Officer <br />located in Ridgway, no fish are present in the L'rcompahgre <br />River at this location. The U.S. Army Corpe of Engineers <br />has stated that no wetlands exist in the area of the <br />proposed operation. <br /> <br />