My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134943
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:40 PM
Creation date
11/26/2007 2:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 47 Appendix F
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PART I <br />Page lib of 29 <br />C. FOOTNOTES (Continued) <br />e/ - Definitions of Sample Type (Continued) <br />6. An "Sa-situ" measurement, for monitoring requirements, is defined <br />as a single reading, observation or measurement taken in the field <br />at the point of discharge. <br />f/ - In the event an o11 sheen is observed, a grab sample shall be <br />collected, analyzed, aad reported. In addition, corrective action <br />shall be taken immediately to mitigate the discharge of oil and <br />grease. <br />pi/ - Salinity shall be measured as Total Dissolved Solids (TDS). Where <br />based on a minimum of 5 samples, the permittee demonstrates, to the <br />satisfaction of the Water Quality Control Division, that the level of <br />TDS in the effluent can be calculated based upon the level of <br />electrical conductivity, the permittee may measure aad report <br />salinity in terms of electrical conductivity. <br />h/ - Salinity shall be sampled on a monthly basis until six samples have <br />bem analyzed. A report of "No Discharge" shall not be counted as <br />one•of the siz sampled. Thereafter, monitoring shall continue on a <br />quarterly basis. Following submittal of initial six sets of monthly <br />data, Che Division shall determine whether the permittee is required <br />to submit a report addreseing salt removal in accordance with <br />Regulations For Implementation of the Colorado River Salinity. <br />Standards Through the NPDES Permit Program 3.10.0. If the salinity <br />report ie required, the Division shall so advise the permittee by <br />letter and the report shall be submitted within 180 days. <br />i/ - This parameter is subject to "Noncompliance Notification" <br />requirements of Part II.A.3.b.v of Chia permit. <br />j/ - Procedure for determining settleable solids is contained in 40 CFR <br />434.64. The method detection limit for measuring settleable solids <br />under this part shall be 0.4 ml/1. <br />AMENDEDJ- ~ -~ S ~. <br />Code: i - 17 Date: 9 - 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.