Laserfiche WebLink
2.06.9 Augerina <br />WFC does not plan to utilize augering at the Golden Eagle <br />Mine. <br />2.06.10 Coal Processina Plants and Support Facilities Not Located <br />' thin the Permit Area <br />Initial coal processing is done at the Golden Eagle Mine. <br />Additional processing is done at the New Elk Mine under an <br />approved permit. <br />2.06.11 In Situ Processina Activities <br />WFC does not plant any in-situ processing activities at <br />the Golden Eagle Mine. Therefore, this Section is not applicable. <br />~• , <br />,~ <br />2.06-4 (Revised 05/12/87) <br />