Laserfiche WebLink
1994 ur:vha.OPron.n'r DRILL HOLIs 111 8 9 4-1 116 <br />I . Drill Rip - proof hole: $ 125/hr. s 4 hrs. _ <br />?. Water Truck -water fair cement: $37.02/hr. s 4 hrs. _ <br />>. Flatbed Truck -Material/supply hauling: $35.07/hr. ~ 4 hrs. _ <br />4. Cemcnc $200/sack ~ 8 sacks = <br />5. Install Marker: $2.OOleach ~ I marker = <br />Subtotal = <br />B. topsoil Replacement - U=c 14 G Grader <br />I . Road (assume I ac,~hr): 1700' .c 25' = 42,500 ft2 = <br />I hr. x $ 136.93/hr. _ <br />2. Pad: 100' ~ 100' = 10,000 tt2 = <br />2 hr. x $136.93/hr. _ <br />3. De~!rade, Disperse Road Surfacing & Rip Pond <br />1,30cy/ 1,028cy/hr = <br />I hr x $171.54/hr = <br />Subtotal = <br />• C. Serdin_ <br />12 acres ~ $20125/ac = <br />Total Bond <br />Seal = <br />Topsoil Replacement = <br />Seeding = <br />Subtotal = <br />17.37%Admin = <br />Total = <br />Say = <br />• <br /> <br />$ 1110.011 <br />$ 148.00 <br />$ 140.00 <br />$ 72.00 <br />$ 2.00 <br />$ 862.00 <br />I.0 ac <br />$ 137.00 <br />0? ac <br />$ 27.00 <br />I hr <br />$ 172.00 <br />$ 336.00 <br />$ 242.00 <br />$ 862.00 <br />$ 336.00 <br />$ 242.00 <br />$ 2,070.00 <br />$ 360.00 <br />$ 2,430.00 <br />$ 2,400.00 <br />M R 97- 154 42 10/2/97 <br />