My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134552
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134552
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:15 PM
Creation date
11/26/2007 2:27:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
Permit File
Doc Date
9/14/1981
Doc Name
MINING PLAN AND TIMETABLE
Section_Exhibit Name
EXHIBIT D
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D (Cont'd) <br />The mine area is to be dewatered and excavated under semi- <br /> <br />dry conditions. Dewatering will be started prior to mining <br />and will continue throughout the life of the mine (see <br />Exhibit G, water Information, for more details). An NPDES per- <br />mit will be obtained from the Department of Health. <br />Before mining begins in each stage, the existing soils <br />and overburden must be stripped, segregated and stockpiled. <br />Soil stockpiles will be established in perimeter areas and <br />in areas previously mined as requirements dictate. Stripping <br />ahead of the mining operation will be reduced as much as pos- <br />sib le so as to minimize visual impact. <br />After the soils and overburden are stripped, excavation <br />will be carried out by using front end loaders to remove the <br />sand and gravel. The material then will be transported to <br />the processing crusher. Equipment to be used may include, <br />but is not limited to, front end loaders, scrapers, a dragline, <br />bulldozers, conveyors, dump trucks and a water truck. <br />As mining proceeds in Stages 1 through 5, the perimeter <br />bank slopes will be mined at 1 to 1 in most cases. As a <br />result, it will be necessary to backfill the perimeter areas <br />to establish 3 to 1 lakeshore slopes. Backfilling will follow <br />as closely as possible the mining of the perimeter areas. <br />The stockpiled overburden will be used as needed for <br />fill problem areas and to smooth the final grading. The stock- <br />piled overburden may also be used to create irregularities <br />along the shoreline to give the lake a more pleasing appearance. <br />htap Exhibit F, the Reclamation Map, does not indicate these <br />-9- <br />