Laserfiche WebLink
<br />HOURLY PRODUCTION cont'd <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />__________________ <br />Roadway urderfooting conditions: <br />Haul :Dirt or lt. surfaced- firm, rolling, maint'd <br />Return:Dir[ or lt. surfaced- firm, rolling, maint'd <br />Sheet 2 of 2 <br /> Grade Rolling Total Travel <br /> Length Resist. Resist, Resist. Time <br />Haul 8 return Time: (ft) (Y.) (X) (X) (min.) <br />Haul Route: 400 5.00 3.00 8.00 0.484 (CHB ••tf~~) <br />Return Route: 400 -5.00 3.00 -2.00 0.291 (CHB Y.'h') <br /> lo[al travel time = 0.775 <br />Total cycle time = 1.255 minutes <br />Loader Bucket Capacity <br />______________________ <br />Rated Capacity= 2.75 LCY (heaped) <br />Bucket fjll factor= 1.000 USER-PROVIDED BUCKET FILL FACTOR INPUT <br />Adjusted capacity= 2.75 LCY <br />Job Condition Correction factors <br />Site altitude = <,230 ft. <br />Altitude correction factor = 1.00 (CH8 DGO) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = O.B3 multiplier <br />Unadjusted Hourly Unit Production 131.48 LCY/Hr <br />Adjusted Nourly Unit Production 109.13 LCY/Hr <br />Adj used Hourly Flee[ Production 109.13 LCY/Hr <br />J08 COST <br />Fleet size = 1 Loader(s) Total job time = 5.15 Hours <br />_____ <br />_____ <br />Unit cos[ _______ <br />= 50.482 /LCY Total _ <br />job tos[ = 5271.40 <br />