Laserfiche WebLink
• • Sheet 1 of 2 <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - YNEEL LOADER YORK <br />Task #: 3 Prep. by: RCO Task filename M131-3 <br />____________ _________ ________- <br />Da[e 06/13/96 Permit #:N-79-131 Nine: Korinek 584 Pit <br />___________- _________ ___________________ <br />Permitting action Final Reclemati on <br />_______________________________________________ <br />Task description Replacing topsoil from stockpiles <br />HOURLY EOU IPMENT COST <br />Basic machine: CAT 936E <br />Attachment #1: ROPS Cab <br />Horsepower = 140 <br />__--_ _____--___ <br />Shift basis:l/day <br />(D01 OSII) <br />Cost Breakdown - Ownership = 514.53 <br />-------------- - Operating-loader = 515.18 <br />- Operator = E22.95 <br />100 X utilization <br />Total cast/hr = E52.65 Total fleet tos[/hr = 552.65 <br />XAIERI AI oUANT1ilE5 <br />___________________ <br />___________________ <br />Initial Swell Final <br />vol une = 500.0 C[Y factor = 1.125 volume = 562.5 lCY <br />___________ _________ -___________ <br />Duan[itY source/reference lnspec[ion measurements and permit file <br />_____________________________________________ <br />X Swell source/reference program <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Loader Cycle Time <br />_________________ <br />Unadjusted Basic Cycle Time (load, du~p 8 maneuver) = 0.490 min. <br />(CHB ll$A) <br />Cycle Time Factors: Factor (min.) <br />Nat erial- Nixed material 0.020 (CHB Ibb) <br />Pile- Conveyor or dozer piled 10 ft. high or 0.010 (CHB ICA) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CHB IbA) <br />Operation- Cons[an[ operation -0.040 (CHB 1DA) <br />Target- Nominal target 0.000 (CHB IDA) <br /> Net Cycle Time Adj.= -0.010 min. <br /> Adj. Basic Cycle Time = 0.480 min. <br />