Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 2 of 4 <br />D. EARTHWRK - Flll COMPACTION <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />n/a <br />Subtotal (D): <br />E. EARTHNORK - RIPPING <br />Task No.~ Task Description I Cast (i) <br />________I__________________________________________________I____________ <br />2 ~ Ripping cork area and pit floor ~ b269 <br />Subtotal (E ): 1269 <br />F. EARTHWRK - ROAD REC(AMA710N <br />cask No.l Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />I n/a I <br />Subtotal (f) <br />G. EAR TH(lORK - FINISH GRADING <br />iask No.~ iask Description ~ Cost (S) <br />________I______________________________~___________________I____________ <br />5 ~ Finish grading of reel aced topsoil ~ E215 <br />Subtotal (G): E215 <br />