Laserfiche WebLink
• .heel 1 of 4 <br />Colorado Division of Xinerals and Geology <br />RECLAMATION COST SUMMARY FORM <br />_____________________________ <br />PERMIT NUMBER X-79-131 PREP, 8Y: RCO FILENAME; X131-0 <br />DATE 13-Jun-96 OPERATION: Korinek 58G Pit <br />PERMIT ACTION Final reclamation <br />GRAND TOTAL BOND AMOUNT : 56,572 <br />I. DIRECT COSTS =___________ <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. EARTHWRK - BACKFILLING 8 ROUGH GRADING <br />Task No.l Task Description ~ Cost (S) <br />________I_~___________~___________~_______________________., I____________ <br />1 I High~all reduction and rough grading I 51,289 <br />I <br />I <br />I <br />_________________________ <br />Subtotal (A ): 11,289 <br />8. EARTHWRK - HIGHVALL REDUCTION <br />Task No.l Task Description I Cost (5) <br />________I__________________________________________________I__________ <br />I see part A <br />I <br />I <br />I <br />Subtotal (B ): <br />C. EARTHWORK - PASTE PILE COVER P(ACEMENT <br />Task No.l Task Description Cost (5) <br />________ I__________________________________________________ I __________ <br />I n/e <br />I I <br />I I <br />I I <br />I I <br />---------------------------------------------------------------------- <br />Subtotal (C ): <br />