Laserfiche WebLink
' . RECLAMAT IO~i SUMMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />________I___________________________________ <br />~heet 9 of 4 <br />~ Cost (51 <br />Subtotal (K1: <br />~ Cost ($1 <br />Subtotal (L1: "--.---L <br />Cosc ($) <br />12 ~ Demolition ~ $10,950 <br />10 ~ Seeding ~ $24,800 <br />~ Fencing <br />11 ~ Mob/Demob ~ 57,509 <br />________________________________________________________________________ <br />Subtotal (M): $92,759 <br />TOTAL DIRECT RECLAMATION COSTS laubto[a is A through M): $127,775 <br />,I I. INDIRECT COSTS <br />A. CONTRAC[OR'S OVERHEAD 6 PROFIT <br />Icem No.~ Icem Description ~ Cost I51 <br />1. ~ Public Liability Insurance.... 1.550} of dir. ~ $1,981 <br />2. ~ Contractor's Pe rfoxmance Bond 0.975} of dir. ~ 51,246 <br />1. ~ Conc ractoz'e Prof is ........... 10.00t of dit. ~ $12,778 <br />9. ~ 7ab Superintendent.. ~ <br />Subtotal IA): 516,004 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 6 P1 :•• 5193,779• <br />H. IN4G PROSECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost I$) <br />1. ~ Minerals Program Admin. Fee at 5.00} of cnc r.~ 57,189 <br />NET INDIRECT COST PERCENTAGE: 18. 19k ~ Subtotal (B1: $7,189 <br />TOTAL INDIRECT RECLAMATION COSTS Isub[o[als A through B1: $23,193• <br />TOTAL PERFORMANCE BOND AMOUNT Idirect plus intlirect costsl:'••5150, 9683 <br />