Laserfiche WebLink
- +_ RECLAMATI ~ST SUMMARY cont'd sheer 3 of a <br />H. EARTHWORK - STREAM CHANNEL RECONSTRVCTION <br />Task No.~ Task Description <br />_______________________________________________ <br />~ Cost (51 <br />Subtotal (H1: <br />I. EARTHWORK <br />Task No.~ <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task Description ~ Cost (5) <br />Subrot al (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (5) <br />5 ~ replace 12" topsoil, 3 acres ~ 56,062 <br />fi ~ spread 12" topsoil on processing plant area ~ $3R, 312 <br />7 ~ replace 12" topsoil over 4 acre settling pond ~ SB, 076 <br />8 ~ final grade 12^ topsoil on lakeshoce ~ Sa, 036 <br />9 ~ replace 12^ copso it over dewatering trench ~ 52,032 <br />$uDtotal (J1: 55R, 518 <br />