Laserfiche WebLink
~ ^ 4 <br /> <br />Col <br />orad <br />D <br />vi <br />f Mi <br />l <br />d G <br />l <br />~ sheet 1 of 9 <br /> • o <br />l <br />slon o <br />nera <br />s an <br />eo <br />o <br /> RECLAMATION COST SUt-4MAY FORM <br />PERMIT NUMBER M-97-058 PREP. BY: GSC FILENAME: MOSS-0 <br /> <br />GATE <br />19-Jan-9 ________ ________ <br />8 OPERATION: Baseline Resource ____________ <br /> <br />PERMIS ________ <br />ACTION _ ____________________ <br />nev permit bond evaluation <br />_________________ <br />_ <br />____________________ ____________ <br /> <br />____________ <br /> _ <br />_ <br />GRAND TOTAL BOND AMOUNT 5150,968 <br />I. DIRECT COSTS =___-_______ <br />A. EAR THWORK - BACKFILLING fi ROUGH GRADING <br />cask No.~ 7ask Descripc ion ~ Cos[ (5) <br />1 ~ replace silly, clayey overburden, 3 acres ~ Sfi, Ofil <br />2 ~ move surge pile into settling pond ~ 51,250 <br />3 ~ replace overburden on settling pond ~ SB, O'!S <br />4 ~ push soil into deva Gering trench ~ 511,110 <br />Subtotal (A1: 526,498 <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task No.~ Task Description <br />________I_____________________________________ <br />Cost (51 <br />________________________________________________________________________ <br />Subtotal (B1: <br />C. EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task No.~ Task Description ~ Cost (51 <br />Subtotal IC): <br />