Laserfiche WebLink
requirements for Section 110 permits at C.R.S. § 34-32.5-110(1)(a)(VIII). <br />- .. . <br />However, consideration of the Construction Material Rules as a whole undercuts <br />this argument. <br />The requirement for item (e), "a statement that the operations will be <br /> <br />conducted in accordance with the terms and conditions listed in the application, as <br />well as with the provisions of the Act and these rules, as amended, in effect at the <br />time the Permit is approved," is also referenced in the left margin as originating <br />from the statutory requirements for Section 110 permits, specifically at C.R.S. § <br />34-32.5-110(1)(a)(IV). Nonetheless, that statement has been incorporated as part <br />of the Section 112 application on page 5 as item 8. <br />Moreover, both types of permit applications are required to attach an exhibit <br />in which the applicant lists the other permits and licenses that will be required by <br />the proposed mining activity. For Section 110 permits, this is Exhibit F, the <br />requirements of which are set forth at C.M.R. 6.3.6. For Section 112 permits, this <br />is Exhibit M, the requirements of which are set forth at C.M.R. 6.4.13. Aside by <br />side comparison of the two rules shows only slight variations in word choice <br />resulting in absolutely no difference in meaning between what is required by the <br />two rules. As set forth below, in both rules the Applicants for Section 110 and <br />5 <br />