Laserfiche WebLink
sheet 1 of 2 <br />I • <br />Scraper work team -Scraper :iCat 637G w/push-puN <br />-Push dozeriNA <br />-Dump area <br />CIRCES Cost Estimatirta Software <br />SCRAPER TEAM WQRK <br />'~!6 ~ ~f ~. II <br />i I Ji <br />PROJECT IDENTIFICATION <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Agency or organization name : CDMG <br />Task # : 054 State :Colorado <br />Date : 12/01/2005 County : Roult <br />User: SLB Site :Seneca li Mine <br />Permit or other job action :Technical Revision 37 <br />Task description :Distribute TSS KK to area near KK <br />• <br />Cost Bre <br />Road maintenance -Motor grader JCAT 14H <br />-Water truck :WWater Tanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Suppori Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA . grader misctruk <br />Utilization-machine : 100 NA NA NA 100 100 <br />-Ripper attachment: NA NA NA NA NA NA <br />OwnerhipcosUhour: $76.44 NA NA NA $34.94 $56.94 <br />Operating cost/hour : $166.38 NA NA NA $42.36 $93.74 <br />Ripper op. cosUhour : NA NA NA NA $0.00 ~ NA <br />Operator cosbhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $109.27 $171.84 <br />Number of units : 4 0 0 0 1 + 1 <br />Group subtotals : Work : $1,099.87 Support : $D.00 .Maintenance : $281.11 <br />Total work team cosUhour : $1,380.99 <br />• <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 12,569 LCY factor: NA <br />Source of quantity takeoff :Table 13-2-6, FPC "TS REPL - KK" <br />Source of estimated swell factor :NA <br />PermNab # : C-1980.005 <br />Abbreviation :none <br />Filename ; 0005-054 <br />Loose <br />volume : 12,569 LCY <br />~' I; <br />~3 -/- B 9 <br />