My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134366
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
Tab 13 Attachment 13-1 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />• Haulinn Capacity <br />Scraper Payoad (weigh) Basis <br />Material weigh : 2,075 pountls/LCY <br />Material description <br />USER-PROVIDED WEIGHT DATA <br />Rated payload : 75, 000 pountls <br />Payload capaaty : 36.14 LCY <br />• <br />Travel time <br />Road condkion descriptor :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul Route <br />sheet 2 of 2 <br />cS3 <br />Scraper Bowl (volume) Basis <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY *" <br />' howly prortiichon refieols volume Per scraper per on pushpull models <br />Cvde Time : Wob Condition Corrections : Ske akkude (ft.) : 7,500 <br /> Scraper ~ Push dozer ~ Source <br />Scraper loading time ' : 1.00 minutes Attitude adj.: 1.000 NA (Cat HS) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />• bad time per scraper pair on push-pull motlels Net CORedIOn 0.830 NA <br />Seg. # ' Haul distance (feet) ~ Grade (%) Roll. res. (%) J Total res. (~°) ~ Veloaly (fpm) Travel time (min.)" <br />1 2,500 8.00 5.00 13.00 710 3.54 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haut time : 3.54 minutes <br />Return route <br />navel time Tor each segment is adlusted Tor acceleratioNdeceleration. Return time : 0.89 minutes <br />table vebcities are maz. ahainabk per total rescetanee shvNn, not average .. <br />Total scraper team tyde time (load + haul + maneuver acrd spread + return) : 6.02 minutes <br />Unadjusted unk produdion8aur : 518.20 LCY/trour "' Adjusted for job conditions : 430.10 LCY/hour <br />Optimal number of scrapers per push dozer : NA Seleded nurnber of scrapers : 2 stxaper(s} <br />Adjusted single scraper team (urrk) hourly production : 430.10 LCY/hour <br />Adjusted mukiple scraper team (fleet) hourly production ; 860.21 LCY/hour <br />• JOS 71ME AND COST <br />Fleet size : 2 Team(s) <br />Unk cost : $1.605 /LCY <br />Total job time : 341.39 Hours <br />Total job cost : $471,454 ; <br />/3-/- SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.