Laserfiche WebLink
sheet 1 of Z <br />I • <br />PROJECT IDENTIFICA710N <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM YYE)RtC <br />f:~ ill lA <br />Agency or organization name : COMG <br />Task # : 052 State :Colorado Penn~ob # : C-1980-005 <br />Date : 12/01/2005 County : Routt Abbreviation :none <br />User : SLB Site :Seneca li Mine Filename :0005-052 <br />Permit or other job action :Technical Revision 37 <br />Task description :Distribute TSS P fo Road E1 <br />.~ ,. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper ;Cat 637G w/puslrpull <br />-Push dozer NA <br />Support equipment -Load area ;NA <br />-Dump area ANA <br />• <br />Cost Bre <br />Road maintenance -Motor grader jCAT 14H <br />-Watertrudc~WaterTanker, 1Q000GaI. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 100 100 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $76.44 NA NA NA $34.94 $56.94 <br />OperaiingcostRrour: $166.38 NA NA NA $42.36 $93.74 <br />Ripper op. cosUnour : NA NA NA NA $0.00 NA <br />OperatorcosUhour: $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $109.27 $171.84 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support: $0.00 Maintenance : $281.11 <br />Total work team cosUhour : $1,380.99 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 617 LCY factor : NA volume : 617 LCY <br />• Source of quantity takeoff :Table 73-2-6, SCC FPC "TS REPL - P" <br />Source of estimated swell factor : NA <br />i~ ~ ~~` ~~l ~!~ <br />l3 -/-85 <br />