My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134366
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
Tab 13 Attachment 13-1 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCT)ON <br />• Haulino Caoacfir <br />Scraper Payload (weight) Basis <br />Material weight <br />Material description <br />USER-PROVIDED th/EIGHT DATA <br />Rated payload <br />Payload gpacity <br />• <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tie penetration <br />Haul Route <br />2.075 pounds/LCY <br />75,000 pounds <br />36.14 LCY <br />icraper Bowl (volume) Basis <br />Struck voume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY "` <br />horu)y production reflects voWme per scraper pair mpush-pill models <br />Cvcte Time : ob Contlition Corrections : Site altitude (ft.} : 7,500 <br /> Scraper I Push dozer Source <br />Scraper loading time' : 1.00 minutes Akilude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job effiaency : 0.830 NA ~ (Cat HB) <br />• wad time per scraper parr on pusRpun models Net correrfion : 0.830 NA <br />Seg. # I Haul distance (feet) ~ Grade (%) Roll. res. (%) Total res. (%} ~ Velocity (fpm) Travel time (min.)"` <br />1 1,000 5.00 5.00 10.00 922 1.71 <br /> <br /> <br /> <br /> <br /> <br /> I <br /> <br />Haul time : 1.11 minutes <br />Return route <br />''travel flme for each 5egmem is atljusletl for accelerafwnldeceleradon. Return time <br />table velocities are max. altainaDle per Ntal resistance stpwn, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit produdion/hour : 987.70 LCY/hour "' Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit} hourly production <br />Adjusted multiple scraper team (fleet) ttourty production <br />• JOB TIME AND COST <br />Fleet size : ? Team(s) <br />Unit cost : $0.842 /LCY <br />sheet 2 of 2 <br />oSt <br />0.45 minutes <br />3.16 minutes <br />819.79 LCY/hour <br />2 scraper(s) <br />819.79 LCY/hour <br />1, 639.58 LCY/hour <br />Total job time : 10.29 <br />Total job cost : $14,209 <br />Hours <br />/3 -/- 85~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.