Laserfiche WebLink
• Task 085 SLB Addendum to Seneca II Reclamation Cost Estimate <br />C-1980-005 1218/2005 Dredge Sediment Ponds <br />Dredge Ponds 004 and 008 during liability period. <br />Based on SCC estimate. <br />Assume'16 ac. ft. (25,800 c.y.) one time <br />Mob/Demob <br />Pumping <br />Total <br />• <br />• <br />1.00 $6,375.00 $6,375.00 <br />25,800.00 $5.92 $152,736.00 <br />$159,111.00 <br />/3-/- /2ro <br />