Laserfiche WebLink
~OADABLE EQUIPMENT <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />Cosf/hr/fleet Retum Trip <br />CosUhr/fleet <br />-Fuel Tanker, 4x2, 170 HP $45.58 1 $45.58 $45.58 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> i <br /> <br /> <br /> <br /> <br />Subtotals $45.58 ~ $45.58 <br />i r s ~gkj~la~^~1~i1~~~x~vr~rp~. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />•Transoortation Cvcle Time : Non- ~ <br />Roadable I <br />Roadable <br /> Equipment ~ Equipment <br />Haul time (hours) _' 4.00 4.00 <br />Retum time (hours) = 4.00 4.00 <br />Loading time (hours) = 4.00 NA <br />Unloading time (hours) = 4.00 NA <br />Subtotals = 16.00 ~ 8.00 <br /> <br />JOB TIME AND COST <br />• <br />Total one-way travel distance <br />Average travel speed <br />sheet 2 of 2 <br />~4 a <br />Denver <br />180.0 miles <br />45.0 mph <br />Total non-roadable mob/demob cost " : $22,282.03 <br />'two muM trips with haul rig <br />Total roadable mob/demob cost " : - $364.62 <br />"one iourM trip, no haul rig <br />Total job time : 32.00 hours <br />Total job cost : $22,647 - <br />I , ''i~' .~,'.!'!P~ 'i', .' ~! . <br />h ..i: <br />.521 ~~ I di' ~s~"~-~ ~~~ <br />/3-/-/2s <br />