My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134363
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:11:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
12/7/2006
Doc Name
Public Scoping Report for the Environmental Impact Statement
From
BLM
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTIONTHREE <br />Scoping Results t <br />associated with the crossing signals and the approach horns of the trains and will <br />eliminate emergency vehicle response problems by keeping the roads open. <br />• Drainage issues and lack of grade separations aze significant concerns. <br />• Railroad spurs aze still the best way to transport coal From the mine to the various <br />mazkets azound the country. <br />• Railroad track and train traffic will complicate access to BLM lands in north Fruits desert <br />for recreationalists and grazing permittees and will create an artificial barrier and safety <br />hazard to livestock and wildlife. <br />• An alternative for EIS consideration would be a railroad spur route ending up in Loma. <br />Some questions that arose and that will be addressed: <br />• Is planning in place for limiting the potential for invasive species, habitat fragmentation, <br />and industrial effluent or run-off at any stage of this proposal azound the rail spur? <br />• Will the railroad spur interfere with extraction of any minerals and/or transportation of <br />gas/oil (pipelines, wells, etc.)? <br />3.8 INFRASTRUCTURE <br />• Citizens hope some of the cumulative impacts of this proposed mine along with the active <br />McClave Canyon Mine to the north could be mitigated through the sharing of <br />infrastructure. <br />• Because Loma is already host to an interstate highway, the main line railway, power <br />lines, and an abundance of county roads, the minimal infrastructure needed to supply the <br />mine would not significantly alter the character of the land. <br />• All pipelines required for and associated with this project, including water-gathering and <br />distribution pipelines, should be paired in the same right-of-way in order to reduce the <br />overall surface impacts of pipeline networks in the project. All pipelines should be <br />buried in road and rail line ROWS and power line corridors, instead of being placed in <br />sepazate ROWS. <br />Some questions that arose and that will be addressed: <br />• Will CAM be building, in the future, a Power Plant there, because of the access to the <br />water, or have these plans already been considered? <br />3.9 TRAFFIC /ROAD IMPROVEMENTS <br />The proposed crossings at 10 Road and at R Road will restrict vehiculaz access by <br />emergency vehicles and school busses. Due to the proposed length of the trains, it is <br />likely that 10 Road and R Road will be blocked the same time. If 10 Road is blocked and <br />if R Road is blocked, the only way to access the upper 10 Road area is a long roundabout <br />way, utilizing M.8 Road. In time-critical situations, this will be an unacceptable increase <br />in the response time of emergency vehicles to upper 10 Road. If, under extraordinary <br /> <br /> <br /> <br /> <br /> <br /> <br />LI <br /> <br />~I <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />3-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.