Laserfiche WebLink
r. • <br /> <br />Page 20 <br />14. "Washing down the dust from the gravel pit operation with 30,000 gallons per day of water <br />is not a good use of a limited resource." <br />1 ~. "Objection to the location of the proposed mining operation." <br />] 6. "Over 70 commercial outfitters are dependent on the Parkdale site, trading a clean industry <br />for a dirty one which will only profit a few. We ought not to let this happen." <br />17. "Economic and quality of life concerns." <br />ISSUES THAT WERE RAISED AFTER THE INITIAL COMMENT PERIOD THAT <br />THE DIVISIONBELIEVESRRE NOT WITHIN THE JURISDICTION OF THE <br />DIVISION OR BOARD <br />"County Road 157 has a 50 foot combined right-of--way through Mazk Brown's property on <br />the east and west sides of the road. This road will not be wide enough for two-way traffic, <br />especially semi-trucks." <br />2. "The azea is not zoned for a tourist train, and therefore the tracks cannot remain." <br />"No proofof compliance with zoning for a tourist "commercial operation" or railroad care <br />repair "industrial zone" has been demonstrated by the applicant." <br />4. "The applicant volunteered during Fremont County CUP heazings and was then requested <br />to conduct ca aci tests of all adjudicated wells and springs within 1.5 miles of [he project <br />permit boundary. Only pump flow tests were conducted. No well capacity testing was done <br />by the permittee." <br />"The applicant is proposing to haul their materials out by rail yet they have no proof of <br />access to any rail line." <br />"The access road bridge is a single lane crossing with a 14 ton capacity." <br />"The road leading from the bridge on the north side of the Arkansas River is a 50 foot right- <br />of-way. This is not enough aze to build atwo-lane road to provide safe access for their <br />trucks, employees, and for myself and my wife." <br />8. "1 fee] the short from #404? Is not adequate to provide comprehensive information on the <br />pits affect." <br />