Laserfiche WebLink
J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />ASK No. Task Description <br />15 Replace Topsoil; Facility, Spoil Base, Pond 007 & <br />Haul Roads <br />16 Replace Topsoil on FinalPit Area <br />30 Replace Topsoil on Pit Turn Slot Cut <br />K. PORTAUSHAFT SEALING <br />TASK No. Task Description <br />18 Spoil Sampling(assume 10 samples/$200 each) <br />19 Rill & Gully Repair <br />20 Construct, Maintain & Operate Flood Irrigation <br />L. DRILL HOLE/MONITORING WELL SEALING <br />TASK No. Task Description <br />17A Seal Underburden Monitoring Wells <br />178 Seal Dakota coal Monitoring Wells <br />17C Seal Overburden Monitoring Wells <br />17D Seal Alluvial Monitoring Wells <br />M. MISCELLANEOUS RECLAMATION TASKS <br />TASK No. Task Description <br />32 phn/elec <br />21 Demolition <br />22 Seeding <br />23 Mob/Demob <br />\J <br />