Laserfiche WebLink
E. EARTHWORK -RIPPING <br />ASK No. Task Description <br />6 Rip regraded Spoil Prior to Topsoil Replacement <br />7 Rip Haul Road Material 3' Deep <br />8 Rip facility Area <br />25 Rip Perimeter Road Material 3' Deep <br />F. EARTHWORK -ROAD RECLAMATION <br />TASK No. <br />Task Description <br />9 Remove Ripped Surtacing Material & Haul to Pit <br />10 Remove 2700/BB road Detour <br />10B REPLACE BB-ROAD WITH PAVEMENT <br />26 Remove ripped Material from Perimeter road& Haul <br />• G. EARTHWORK- FINISH GRADING <br />TASK No. <br />Task Description <br />11 Final Grade Disturbed Areas -include in B&G <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />TASK No. Task Description <br />12 Reconstruct Drainage <br /> <br />