Laserfiche WebLink
TABLE ]. REFUSE PILE EXPANSION MATERIALS BALANCE ESTIMATED QUANTITIES <br />~.. <br />. Project <br />Phase Disturbed <br />Area <br />(acres) 1 foot <br />Topsoil Cut' <br />( ) Subsoil <br />Cut <br />(cY) 2 toot <br />Clay Liner Fill' <br />(cY) Pond <br />Berm Fill <br />(cY) Refuse <br />Fill <br />(cY) Under-Drain <br />Length <br />(ft) Under-Drain <br />Rock Fill <br />(~Y) <br />Phase 1-A 4.37 7,050 21,713 12,010 15,795 ~ ~ 0 697 413 <br />Phase 1-B 0.65 1,048 27,084 2,170 0 27,575 101 60 <br />Phase 1-C 0.95 1,532 48.063 4,716 0 32,167 132 78 <br />Phase 1-D 1.59 2,565 64,227 7,836 0 60,138 500 296 <br />Phase 2 0.00 0 0 0 0 70,738 0 0 <br />Phase 3 9.05 14,600 0 29,200 0 930,442 0 0 <br />Phase a 3.95 6,373 0 12,746 0 263,102 0 0 <br /> <br />TOTALS 20.56 33,168 161,087 68.678 15,795 1,384,102 1,430 847 <br /> <br />Designated for stockpiling for reclamation; same quantity of subsoil to be stockpiled (reclaimed surface to consist of <br />18-24 inches of soil). <br />To be applied if clay liner u selected in lieu of ¢eosynthetics. <br />~~ <br />TABLE 2. PREDICTED REFUSE PRODUCTION <br />Date Refuse Production (tons)' Cumulative Refuse Placed in RPE (tons) <br />Apr '97 0 0 <br />Mav '97 0 0 <br />Jun'97 0 0 <br />Jul '97 0 0 <br />Aug '97 0 0 <br />Sep '97 0 0 <br />Oct '97 0 0 <br />Nov '97 0 0 <br />Det '97• 0 0 <br />1998 78.300 78.300 <br />1999 44,600 122,900 <br />?000 30.000 IS?,900 <br />?001 30.000 182,900 <br />2002 30,000 212.900 <br />2003 30.000 242.900 <br />2004 30.000 272.900 <br />2005 30.000 302.900 <br />2006 30.000 332.900 <br />* Completed Initial Construction in December 1997 <br />s <br />