Laserfiche WebLink
Table 3 <br />Sylvester Gulch Facilities <br />Quantities of Materials for Reclamation <br />• Switchgear Buildings <br />18'x36'x9'+10'x12'x9'= 6,912c.f. <br />• Concrete Slab (1'thick) <br />18'x36'+10'x12'= 768s.f. <br />(broken up and buried in place) <br />• Equipment (Breakers, Switches, etc.) 5 tons <br />r 1 <br />L. J <br /> <br />Light-Use Roads (Alp -Includes Landings for Power Poles <br />11,000' x 30' = 7.6 acres + 2 acres = 9.6 acres <br />• Culvert <br />15", 30" diameter CMP = 2401.f. <br />• Re-topsoil and Re-seed <br />• Backfill Dozer Push <br />11,000' x 14' x 4' = 22,800 c.y. <br />• Rip/Reclaim Road <br />11,000' x 14' = 154,000 s.f. = 3.5 acres <br />Shaft Site <br />• Sediment Pond Liner <br />40,000 s.f. (buried in pond) <br />• Sediment Pond Concrete Apron <br />{ 1' thick) <br />40'x90'= <br />(broken up and buried in pond) <br />• Culvert <br />30" diameter CMP, 370' <br />• Culvert <br />Gxhibit 69 4 <br />3,600 s.f. <br />Nov. 1996 PRO?R. Revised Oct. 1993 TRBG <br />