Laserfiche WebLink
. Table 3 <br />Sylvester Gulch Facilities <br />Quantities of Materials for Reclamation <br />• Concrete Encased Buried Conduit <br />2'x2'x400'= <br />• Lightweight Concrete Cable Trench <br />3'w x 2'h x 3'd Box Section - 4'1 <br />pre-cast units = <br />(Broken up and buried in place) <br />• Power Cable <br />(Laved Loose in Cable Trench) <br />12 each x 220' _ <br />(Buried in place) <br />• <br />• Grounding Grid (4/0 Wire) <br />10 each x 20' _ <br />(Buried in place) <br />• Stairs to Switchgear Buildings <br />6@4'wx3'h <br />concrete landings <br />6@6"d (6'x6') <br />Transmission Line (DMEA Salvage) <br /> <br />U <br />477 ACSR Overhead Cable <br />3 wires x 7200' _ <br />4/0 Static Line w/Fiber Optic Cable <br />Poles <br />23 each, 65' wood poles, 18" dia. <br />1600 c.f. _ <br />2201.f. <br />2;640 l.f. <br />200 l.f. <br />21,600 l.f. <br />7,2001.f. <br />Self-Supported Pole <br />80'h, 6' dia. Steel plate (tapers to 2' dia.) <br />Distribution Line <br />• 336 ACSR Cable (Overhead) <br />5,700'x9+1800'x3= <br />• Poles <br />34 each, 50' wood poles, 18" dia. <br />Exhibit 69 3 <br />56,700 I.f. <br />59 c.y. <br />Nav. 1996 PRO7R. Revised Ocl. f 998 TR86 <br />