My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />• TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O(Minerals And Geology <br />Task#: 10c State :Colorado PenniUjob#:C-81-012 <br />Date: 03r21/2002 County :Las Animas Abbreviation :none <br />User : JHB Site :New Elk Mine Filename :C012-fOc <br />• <br />Material weight : 1,600 pounds/LCY Struck volume : 12.00 LCY <br />• bituminous, raw Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 30.00 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 14.85 LCY <br />Loading Tool CaoaciN: ob Condition Corrections : Site altitude (R.) : 7,400 <br />Rated capacity (nom. heaped) : 4.500 LCV Truck Loader Source <br />• <br />Descr.:Other- rock/din mixtures (100-120% J Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : <br />.. .. ......: ........: ~....r. 4.950 LCY <br />..:..:.:. Nel correction : <br />~:: ~~ :.. ..:.... ~ 0.830 <br />:.:.. 0.830 <br />Permit or other job action :2001 Midterm <br />Task description :Haul raw coal storage footprint to Development waste pile <br />,..:... <br />HOURLY EQUIPMENT COST Shin basis : 1 per day <br />TruclNoader team -Truck :Generic 12-18 cy, 6x4 <br />-Loader :CAT 966E S.2 std. IiR (1999) <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area : Ca[ D8R - 8SU <br />Road maintenance -Motor grader <br />-Water truck <br />2,500 Gal. <br />Cost Breakdown : ruck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA misctruk <br />Utilization-machine : 100 100 100 100 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cosf/hour : 820.12 830.78 843.04 $43.04 NA 87.65 <br />Operating cost/hour: $26.72 $30.74 $65.98 $65.98 NA $2.49 <br />Ripper op. cosUhour : NA NA 80.00 $0.00 NA NA <br />Operator cosUhour : 823.61 827.99 827.99 $27.99 NA $23.61 <br />Unit subtotals : 810.45 $89.51 8137.02 $137.02 NA 833.74 <br />Number of units : 3 1 1 1 0 1 <br />Group subtotals : Work : 8300.86 Support : 8274.03 Maintenance : $33.74 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5,880 <br />Total work team cost hour : $608.64 <br />Swell Loose <br />CCY factor: 1.035 volume: 6,088 LCY <br />Source of quantity take-0H :Permit Map 13- 1 R. thick <br />Source of estimated swell factor :Caterpillar Handbook <br />Materal purchase cost : 80.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Caoacitv ; <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Descr.: Coal <br />.c',ck ZlJ=fq /Qevrs~ tf/oL <br />
The URL can be used to link to this page
Your browser does not support the video tag.