My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134114
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:48 PM
Creation date
11/26/2007 1:56:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/4/2003
Section_Exhibit Name
Exhibit 28 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : f06 sheet 2 of 2 <br />,. <br />Loadlna Tool Cvcle Time : Number of loading tool passes required to fill truck : <br />~~ ~ 3 ~ ~ passes <br />Excavators antl front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.:NA <br />-cycle lime elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.525 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HBJ <br />Stockpile : Conveyor or dozer piled l0 n. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HBJ <br />Operation : Constant operation -0.040 (Cat HBJ <br />Dump target : Nominal target 0.000 (Cat HB) <br />• <br />`J <br />Net cycle time adjustment : -0.050 minutes <br />Adjusted Dasic cycle time : 0.475 minutes <br />Nel load time per truck (bulk of first loader pass completed during truck exchange) : 1.050 minutes <br />Truck Cycle Tlme <br />Truck exchange lime: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: 1.050 minutes........ Adjusted for site altitude : 1.05 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.90 minutes <br />Truck travel (haul 8 return) time: <br />Road condition description :Firm, smooth, rolling, dirt or light surfaced, watered, maintained <br />Haul route <br />' Grsl antl last segments atlryele0 br ettelBrelioNtleceleralion Return lime " . <br />•• lime snoe,n incwEes anwae adius~mem Total truck cycle time : <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (°/) Speed <br />IeeUminute ~ Travel time ' <br />(minutes) <br />1 1,400 11.50 3.00 14.50 616 2.30 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul time ": 2.30 <br />1 1,400 -11.50 3.00 -8.50 3520 0.60 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Loading tool unit production : 574.84 LCY/hour...... Adjusted for job efficiency <br />Truck unit production : 166.38 LCY/hour...... Adjusted for job efficiency <br />Optimal no. trucks/loading tool : 3 trucks........... Selected no. trucks/loader <br /> Adjusted hourly truck team production <br /> Adjusted houdy single truck/loader team production <br />0.60 <br />5.36 <br />477.12 <br />138.09 <br />3 <br />414.28 <br />4142A <br />Adlusted twudy multiple trucklloader team production'. 474.ZC <br />ninutes <br />minutes <br />minutes <br />LGY/hour <br />LGY/hour <br />trucks <br />LCY/hr <br />LCYIhr <br />LGYShs <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 13.57 Hours <br />Unit cost : $1.469 lLCY Total job cost : $8,261 <br />~xk Le -f8 Revrsed/ y/mom <br />