My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133980
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:41 PM
Creation date
11/26/2007 1:47:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Permit File
Doc Date
5/13/1977
Doc Name
MINING PLAN THOMAS PIT ANIMAS AGREEGATES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-2- <br /> <br />free seed bed. Fertilizer will be applied in conjunction with <br />the discing operation. Seeding mill then be performed using a <br />grass land drill. The entire operation will take appr~~ximately <br />one to two weeks and be performed during a period from May <br />to August. <br />A commercial fertilizer will be used and will be based <br />upon a soil analysis at the time of reclamation as rec~~mmended <br />by the S.C.S. <br />A seeding mixture has been recommended by the Soil <br />Conservation Service for irrigated pasture in this area. This <br />mixture will be used and contains 1 Lb. of Creeping Fo:hail <br />(Garrison), 1 Lb. of Orchard Grass ( Latan or Potomas 'Cardus), <br />1/2 Lb. of Timothy (Climax), and 1/2 Lb. of White Clover (Ladino). <br />These quantities are given in pure live seed per acre. <br />The existing haul road, well, and buildings will <br />remain as they are. The existing fence will be lengthened <br />to protect revegetated areas from livestock until the grasses are <br />established. Fencing will be four strand barb wire. <br />This initial reclamation work will take from six <br />months to one year of total time and require approxima~:ely 20 <br />days of actual work. As no major reclamation can begin until <br />mining ends, and as mining is planned on a continual b;isis, <br />no date has been set to begin reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.