My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133977
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:41 PM
Creation date
11/26/2007 1:47:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005050
IBM Index Class Name
Permit File
Doc Date
11/30/2005
Doc Name
Initial Financial Warranty Estimate
From
DMG
To
Rim Rock Exploration and Development
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/Fleet Return Trip <br />CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $52.44 1 $52.44 $52.44 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $52.44 $52.44 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.75 0.75 Total non-roadable mob/demob cost' <br />0. 75 0.75 'two round trips with haul rig <br />0.50 NA Total roadable mob/demob cost " <br />0.50 NA "one rountl trip, no haul rig <br />2.50 1.50 <br />Nafurita <br />30.0 miles <br />40.0 mph <br />$440.05 <br />$78.67 <br />JOB TIME AND COST Total job time : 5.00 hours <br />Total job cost : $519 <br />
The URL can be used to link to this page
Your browser does not support the video tag.