Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :DMG <br />Task # : 07a State :Colorado <br />Date : 11/30/2005 County :Montrose <br />User: GRM Site :JBirdsMine <br />sheet 1 of 2 <br />Permit or other job action :Final Reclamation Initial Estimate -2005 <br />Task description :secondary seeding mobilization <br />EQUIPMEM7 TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $23.32 $25.78 $31.45 <br /> OperatingcosUhour: $30.29 $31.74 $35.14 <br /> Operator cosUhour : $27.40 $27.40 $27.40 <br /> HelpercosUhour: $0.00 $25.15 $25.75 <br /> Total Unit CosUhour: $81.01 $110.07 $119.13 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />CosUfleet <br />-reveg equipment 10.00 $10.00 $81.01 1 $91.01 $81.01 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $91.01 $81.01 $0.00 <br />Permitfjob # : M-2005-050 <br />Abbreviation :none <br />Frlename : M050-07a <br />