My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133821
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:31 PM
Creation date
11/26/2007 1:39:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Permit File
Doc Date
5/17/1984
Doc Name
APPLICATION FOR A DEPT OF THE ARMY PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />d. How many residences, businesses, farms, individuals, etc. will <br />this project serve within the first }•ear that it is completed? <br />Three businesses (aggregate mine, gas station and restaurant/store). <br />No residential. <br />Anticipated number that it will serve within the near future (For example <br />five years, ten years)? <br />Three - the same businesses. <br />e. Approximate distance to the nearest: <br />residences - <br />hospital - <br />park - <br />school - <br />5 miles <br />25 mi 1 es +/- <br />3 miles <br />3 miles <br />other public facilities -3 miles <br />Will any of these facilities be disturbed in any way other than construc- <br />tion noise (i. e., right-of-way condemnation)? <br />No <br />f. Vr'hat water related recreational uses are made of the area? (i.e., <br />boatiry, fishing, waterfowl hunting, etc.?) <br />Fishing on a limited basis. Some tubing or rafting may occur on the stream <br />occasionally. <br />How will these activities he affected? During construction access to the stream <br />will be limited during working hours. We do not expect the project to affect <br />activities once construction is complete. <br />7. Is this a totally new facility? If not, briefly describe what it will <br />replace. <br />No - the road is to be widened along this stretch of creek to allow construc- <br />tion of the accelerationjdeceleration lane. <br />{tiill this constitute an increase in cap;icity, safety, or convenience over <br />existing Facilities? If so, please Describe. <br />Yes - it will allow better flow of traffic along U. S. 6 when mining operations <br />commence. The work will be on Colorado Highway Department right of way. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.