My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133792
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:29 PM
Creation date
11/26/2007 1:36:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
9/26/2007
Doc Name
Permanent Impoundment Documentation for Pond F
Section_Exhibit Name
Exhibit 42C
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The water level shall be sufficiently stable and the configuration of the pond shall be <br />adequate to support the intended use. <br />Pond F typiglly fills to near discharge level during the early spring due to snow melt and rain <br />fall. Some discharge may occur over a 2 to 3 week period for a typical precipitation situation. <br />During the summer months, this pond tends to dry up. However, the standard grazing schedule <br />for the Pond F area coincldes with the time when the most water is typically retained in the <br />pond. No grazing occurs in this pasture during the summer or fall so the possible lads of water <br />is of no concern for this benefidal use. A letter from the ranch owner indicating this situation is <br />attached. Retaining this pond permanently will also assist in distributing livestock use over a <br />broader area and thereby decreasing the potential overuse of the more sensitive drainage <br />bottoms. Pond water will be available for wildlife at all times and will be a supplemental supply <br />of water that may be important during drought. <br />The Pond F embankment was constructed with 3H:1V slope down stream and slight steeper up <br />stream. The dam is approximately 10 feet high and 400 feet long. The surrounding natural <br />slopes are gentle (10 to 14 percent) such that access to the water (by livestock) is not a <br />problem. <br />C. Adequate safety and access to the impounded water shall be provided for the proposed <br />water users <br />The proposed users of this pond include cattle artd wiidlfie. The embankment dam height is <br />approximately 10 feet. There is a 3H:1V slope on the outside embankment and a 2.5H:1V slope <br />on the inside embankment. The shores of the pond and the embankment are well vegetated <br />except for the emergency spillway rip rap. The natural topography surrounding the remainder of <br />the pond is relatively flat with approximately a 10% to 14% northerly slope into the pond. The <br />gentle slopes should not restrict access or pose any safety issues for the cattle or wildlife, which <br />have utilized this pond for many years without incident. <br />D. Impoundment shall not result in diminution of quality or quantity of water available to water <br />right holders (or other uses) <br />As discussed above, historically the quality of any discharge from Pond F have met all water <br />quality standards of the discharge permit and it is not expected to degrade the water quality in <br />any receiving streams. In 1986 the Water Referee for Water Division 6, State of Colorado <br />recommended the water rights for the Marr Mine Sediment Ponds (A through F) be declared <br />absolute (see attachment). The ponds were decreed for all benefidal uses including livestock, <br />wildlife and industrial (including dust suppression). Agriculture is the primary user of surface <br />and/or groundwater in the immediate vidnity of the mine including livestock and irtigation. <br />Ultimately, any surface water flows reach the Canadian and North Platte Rivers where <br />additional uses, particularly recreation, occur. <br />The quantity of water available to other downstream users is diminished somewhat by the <br />consumptive use of Pond F, which includes water storage, evaporation and animal use, mainly <br />in the spring. Historically there have been no downstream calls for valid senior water rights. <br />Down stream use largely includes irtigation, which occurs later in the year. There is minimal <br />potential for a down stream call on Ken's existing absolute water right. Also note that this is a <br />very small watershed and the amount of water taken out of the larger hydrologic system is <br />considered miniscule. Refer to Exhibit 25 of the Kerr Mining and Reclamation Plan document <br />Permanent Pond FDocumentation -Exhibit 42C Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.