My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133656
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:19 PM
Creation date
11/26/2007 1:25:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Permit File
Doc Date
9/30/1978
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U <br />materials involved, adequate time has been allotted to do alpha surveys <br />for what is essentially a salvage operation <br />supervisory and labor estimates. <br />Equipment Expense <br />The same is true for the <br />4'he first category, labeled "Dismantle and Salvage nuildings'', <br />represents the maximum artiuunt of equipment tlme required to clean t/~• <br />site under a full scale salvage assumption. Although this work could be <br />done much more quickly, this estimate is based on attention to equipment <br />and structural materials retrieved for salvage. This aspect is pzirtic- <br />ularly evidenced in the projected costs for crane time. Finally, the <br />function of rerraviny fuel tanks and grading the boneyard includes the <br />removal of below grade facilities like tanks, major pipes, culverl:s, etc. <br />Revegetation <br />with short term reclamation completed, approximately flfty errs of <br />disturbed area will require final reclamation at th• end of the mine Ii fr. <br />This work is split between steep and shallow slope work dlstinguis~hed <br />From a cost standpoint by the level of surface preparation required and <br />the method of seed placement. <br />Steep slope areas include nearly the entire western portion of the <br />site and the railroad right-of-way. Extensive earth work, particularly <br />regrading and the construction of erosion control structures, will 6e <br />required and is included in the "Site Clean-up" section in the 13: hours <br />of D-7 dozer time. After the soil mass is restructured, seed and mulch <br />r ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.