My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133656
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:19 PM
Creation date
11/26/2007 1:25:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Permit File
Doc Date
9/30/1978
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~/ I the cost per yard of delivered topsoil has bean amended to SS per cubic <br />yard. <br />Waste Haulage to Loee1 Lanciflll <br />The estimated 290 tons of non-radioactivo unsalvagable materials era ~ ~, <br />primarily concrete and soil from areas not covered by the Radioactive <br />Materials License. This material will come primarily from the shops, <br />compressor and lubricant storage sheds and the office. Twenty-five miles <br />should be ample haulage range to get to the dump, and provide a sub- <br />stantial mileage contribution to the topsoil backhaul as well. <br />Contaminated Waste Haulage to Canon City Mill <br />I <br />A small volume of material may show enough alpha activity to warrant ~~ <br />I <br />transport to Canon City for controllod disposal. Currently, parts of <br />the boneyard may fall in this category as well as portions of the .call- ~I <br />road base used to tram ore. A11 materials with an alpha emission .if <br />15,000 dpm per 100 cmZ will be sent to the Canon City Mill. <br />Borehole Scaling <br />In discussion with the Engineering Department at the mine, the cost <br />estimate of borehole scaling is considered representative. <br />Boneyard Clean-up <br />This Function is similar in crew and task requirements to the task <br />described in the foregoing section entitled "Dismantle Buildings/Surface <br />Facilities". Considering the small amount of potentially contamin~3ted <br />
The URL can be used to link to this page
Your browser does not support the video tag.