Laserfiche WebLink
1 <br />' 1. Upon completion of drilling activities at a given site, all <br />debris, trash, and drilling related equipment will be <br />removed from the site. <br />2. When the mud pit is sufficiently dry, it will be filled with <br />stored subsoil material and compacted to minimize any <br />settling. All remaining material will be redistributed on <br />and around the drill pad with a backhoe and/or bulldozer to <br />achieve as closely as possible, the original contour of the <br />site. <br />' 3. Topsoil will be distributed as evenly as possible over the <br />disturbed pad area. <br />' 4. The entire drill pad area will be re-seeded using the <br />following seed mix or a mixture developed in consultation <br />with the appropriate landowner or that specified by the <br />' Bureau of Land Management. <br />Species PLS lb/Acre <br />' Smooth Brome 7.0 <br />Intermediate Wheatgrass 6.0 <br />' Crested Wheatgrass 3.0 <br />Alfalfa 1.0 <br />TOTAL 17.0 PLS lbs/acre <br />' All roads and trails used or constructed during the exploration <br />program will be rehabilitated. Existing roads will be returned <br />' to a condition equal to or better than their condition prior to <br />commencement of the exploration activities. New roads which have <br />been constructed will be leveled and scarified, top soil <br />redistributed where applicable, and seeded, once they are no <br />' longer needed. <br />The reestablishment of vegetation on reclaimed sites and <br />' abandoned roads is the planned method to prevent erosion. <br />The estimated reclamation liability is presented in Appendix 1, <br />' for the purpose of assisting in determining bonding requirements. <br />Seismic Survev Operations: <br />' Four seismic survey lines are planned as a portion of this <br />exploration plan. The locations of these lines are illustrated <br />' on Map 1. The total length of these lines is approximately 11.75 <br />miles. Lines 1, 2, and 4 are located on private surface <br />overlying federal coal, while Line #3 is located on a combination <br />' of federal and privately owned coal and private surface. The <br />total length of lines 1 and 2 are 6 miles. The length of line 3 <br />27 <br />1 <br /> <br />