My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133602
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:16 PM
Creation date
11/26/2007 1:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tipple Rule 2.06 Requirements for Permits for Special Categories of Mining
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) No permit shall be issued for any operations covered by 2.06.9 <br />unless the Division or Board finds, in writing, that in addition to meeting <br />all other applicable requirements of these Rules, the operation <br />will be conducted in compliance with 4.23. <br />RESPONSE: <br />CYCC does not intend to conduct any angering operations at the Fish <br />Creek Tipple. For this reason, Rules 2.06.9 and 4.23 are not <br />applicable to this permit application. <br />Rule 2.06.10 - Coal Processing Plants and Support Facilities Not Located <br />Within the Permit Area <br />1) Scope. 2.06.10 applies to anv person who conducts or intends to <br />conduct surface coal mining and reclamtion operations utilizing coal <br />processing plants or support facilities as described in 4.04 not within a <br />• permit area of a specific mine. Any person who operates such a processing <br />plant or support facility shall have obtained a permit from the Division or <br />Board under the regulatory program in accordance with the requirements of <br />2.06.10. <br />2) Anv application for a permit for operations covered by 2.06.10 <br />shall contain in the mining and reclamation plan, specific plans, including <br />descriptions, maps, prepared to the standards of 2.10, and cross-sections <br />of the construction, operation, maintenance, and removal of the processing <br />plants and assoicated support facilites. The plan shall demonstrate that <br />those operations will be conducted in compliance with 4.28. <br />(3) No permit shall be issued for any operation covered by 2.06.10, <br />unless the Division or Board finds, in writing, that, in addition to <br />meeting all other applicable requirements of these Rules, the operations <br />will be conducted in compliance with the requirements of 4.28. <br />• <br />2.06-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.