Laserfiche WebLink
Benson Brothers Pig Mesa Pit <br />DMG 112 Application <br />Exhibit L -Reclamation Costs <br />Earthwork: High-wall reduction 25ft vert. to 3:1 slope x 1800ft 1.33 swell = 20781 cy <br />Cat D9R estimated at 1019 cy/hr@ $180/hr = $3,671 <br />Rip 20 acres Cat 14H grader @ $108/hr x 1 ac/hr x 20 = $2,160 <br />Replace overburden Cat 633E Series2 Scraper @$401/hr x <br />8" on 20 acres 21,511cy/1320 cy/hr for 400 foot avg haul = $6,535 <br />Replace topsoil Cat 633E Series2 Scraper @$401/hr x <br />8" on 20 acres 21,51 lcy/1320 cy/Itr for 400 foot avg haul = $6,535 <br />Grade 20 acres Cat 14H grader @ $108/hr x 20ac/1.3 ac/hr = $1,662 <br />Seeding and mulch Assume $1000/acre, 20 acres <br />50% failure rate = $30,000 <br />Mobilization 5 miles one way, includes seeding equip. _ $3,000 <br />Subtotal = $53,563 <br />Overhead and Profit Subtotal x 17% _ $ 9106 <br />Total Contract = $62,669 <br />DMG Management 5% of Total Contract = $ 3,133 <br />Total Bond Amount = $65,802 <br />