Laserfiche WebLink
Photos #18-19) Typical cracking of the concrete on the upper side of the bridge. <br />Photo #20) Lazge impact or spalling mazk on concrete on the upper, east side of bridge. <br />Photo #21) Overview of upper side of bridge from the east. <br />~ Photos #22-24) Typical cracking on the upper, east side of bridge. <br />' Roll #2 <br />' Photos #1-3) Corrosion of steel girders and rails of older portion of bridge. <br />Photos #4-6) Indicative cracking of concrete beams, from the top side. <br />Photo #7) Overview of the south half of the bridge, taken from the west. <br />Photos #8-10) Typical cracking of the concrete on the upper, west side. <br />I <br />' Inspection completed <br />~~~~~~~ <br />Phil Musial <br />Field Representative <br />I <br />E <br />L <br />