Laserfiche WebLink
i COLORADO MINED LAND RECLAMATION DIVISIOK <br /> <br /> ESTIMATING FORM - BULLDOZER idORH <br /> <br />• TASH NO. 3 __~- PREP. BY: - TDG-` PERMIT NO. C_`8_1-0_15_ <br /> DATE ': 02/20/90 FILENAME: C015-3 OPERATION: Fruits gl ~ •2 <br /> <br /> PERMIT ACTION Reclamation Only Permit <br /> <br /> TASH DESCRIPTION Excavate A stockp ile cover material for cost pile <br /> <br /> HOURLY EQUIPMENT COST: Single, Double, <br /> Labor or Triple <br /> County: MESA Zone 1 Shifts S <br /> 1__`.r .Y_4 _~r 4_4_.r__ _._._4_M_ <br /> Machine Deacript. CAT D9L with univ ersal blade & 3-shank ripper <br /> own <br />: <br />Cost Breakd Utilization Equipment <br /> __ <br />_ <br />Y.r. _..r. _4_ _ <br />adjustment: <br />Filename: <br /> Ownership cost/hr = E52.20 N/A D9L-U3RP <br /> Operating k overhaul cost/hr- Dozer = 554.09 (100X) " "`""` <br /> -Ripper = 50.00 f0%) <br /> Operator cost/hr = 520.08 N/A Total Fleet <br /> --------- Cost/Hr: <br /> Total 8gpt. Unit Cost/Hr = 1126.37 5126.37 <br /> MATERIAL QUANTITIES: <br /> Beg. <br /> 2000 <br />LCY <br />Volume: <br /> _--`_` <br />` <br />Initial Swell Loose <br /> Volume: 2,000.0 LCY Factor: N/A Volume: 2,000.0 LCY <br />i ,:. Source of quantity take-off: App. pp. 77-80 <br /> Source of est. swell factor: N/A <br /> <br /> HOURLY PRODUCTION: <br /> Job Condition Correct ion Factors <br /> Avg. push distance: 60.00 ft. """""""""" ""_.._.._..__ <br />~ <br /> ..__.._.._.._ Operator.......... 0.75 (avg. <br />' <br /> Unadjusted hourly Mat. consistency.. 0.80 <br /> dozer production: 2104.36 LCY/hr Dozing method..... ,1.00 (gen. <br /> " """ ` Visibility........ 1.00 (avg. <br /> Material consistency: Job efficiency.... 0.83 (lsh/' <br /> Rock, well ripped or blasted Transmission type. 1.00 (ps) <br /> """'_•_`_"_"""""_`_"""` Grade adjustment.. 0.67 <br /> Avg. push gradient: +20.00 X Altitude adj. .... 1.00 <br /> " " " " ` Material weight... 0.79 <br /> Avg. site altitude: 5515.00 ft. Blade type........ 1.00 (S or! <br /> Material weight 2900.00 lb/LCY Net Job Correction 0.26 <br /> Mat. Descr.: ----___.._ __.._.._...._.._ <br /> Decomposed rock - 50% Rock, 50X Earth Adjusted Unit Prod.: 553.99 LCY/h <br /> <br />• Adjusted Fleet Production: _ " `_553199 LCY/t <br /> JOB COST: <br /> Fleet size : 1 Dozerls) Total Job Time: 3.61 Bourf <br /> . Unit Cost E0.228 /LCY Total Job Cost: 1456.24 <br />' 7! <br />