Laserfiche WebLink
COLORADO MINED LAND RECLAfiATIO~ DIVISION <br />ESTIMATING FORM <br />TASK NO. ,.____2...-~~ PREP. HY: ~`TDG_ <br />DATE 07/02/90 FILENAME: C015-2 <br />PERMIT ACTION Reclamation Only <br />Unadjusted hourly <br />dozer production: 833.13 LC1'/hr <br />TASE DESCRIPTION Regrade upper (Fruits fl) mine bench <br />HOURLY EQUIP[~NT COST: Single, Double, <br />Labor or Triple <br />County: "-MESA"L`4 Zone _..-1..-` Shifts _.._,.S".- <br />Machine Descript. CAT D9L with universal blade & 3-shank ripper <br />Cost Breakdown: Utilization Equipment <br />" " " " " " " adjustment: Filename: <br />Ownership cost/hr = (52.20 N/A D9L-U3RP <br />Operating 8 overhaul cost/hr- Dozer = 554.09 (100X) "" " " " <br />-Ripper = 50.00 (OX) <br />Operator cost/hr = 520.08 N/A Total Fleet <br />--------- Cost/Hr: <br />Total Eqpt. Unit Cost/Hr = 5126.37 5126.37 <br />MATERIAL QUANTITIES: <br />BeS. <br />Volume: " ~37459.54CCY <br />Initial " Swell Loose <br />Volume: 37,459.5 CCY Factor: 1.280 Volume: 47,948.2 LCY <br />Source of quantity take-off: app. pp. 72-76 (incr. 30X to acct. for poss. er <br />Source of est. swell factor: Operator estimate based on field sampling <br />HOURLY PRODUCTION: <br />Avg. push distance: 200.00 ft. <br />i <br />Materiel consistency: <br />Compacted fill or embankment <br />Avg. push gradient: +17.00 X <br />Avg. site altitude: 5640.00 ft. <br />- BULLDOZER WORK " <br />.r-~r___~r_4_•-____ <br />PERMIT N0. C-81-015 <br />OPERATION: Fruits fl & i2 <br />Permit <br />Job Condition Correction Factors <br />Operator.......... 0.75 (avg. <br />Mat. consistency.. 0.90 <br />Dozing method..... 1.00 (gen. <br />Visibility........ 1.00 (avg. <br />Job efficiency.... 0.83 (lsh, <br />Transmission type. 1.00 (ps) <br />Grade adjustment.. 0.73 <br />Altitude adj. .... 1.00 <br />Material weight... 0.79 <br />Blade type........ 1.00 (S o: <br />Material weight 2900.00 lb/LCY Net Job Correction 0.33 <br />Mat. Descr.. -`_.._.._.,_ _. ,-_...._..___ <br />Decomposed rock - 50X Rock, 50X Earth Adjusted Unit Prod.: 270.94 LCY/i <br /> <br /> Adjusted Fleet Production: ` __-`270194 LCY/] <br />JOB COST: <br />Fleet size 1 Dozers) Total Job Time: 176.97 Bour <br />Unit Cost 50.466 /LCI' Total Job Coet: 522,364 <br /> <br />