iiiiiiiiiiiiiiuiii <br />Doc Date:12/11I2001 <br />J <br />2.05.4(2)(a) RECLAMATION TIMETABLES <br />Once the reclamation-only permit is approved, reclamation work <br />will proceed within 30 days of the final public notice published <br />in the newspaper. It is estimated that the backfilling, grading <br />and topsoil replacement will take 30 days for completion. <br />Prior to reseeding, all topsoiled areas will be sampled and <br />analyzed for revegetation suitability. The results will be <br />reviewed with the Division and any adjustments to the fertilizer <br />required and/or seed mix will be made at this time. It is <br />estimated that this work will take 20 days for completion. <br />Immediately following the above work, the site will be <br />hydromulched. This work should take approximately 8 days for <br />mobilization and application. <br />If it appears that approval will be granted sometime in October <br />of 1989, all efforts will be made to complete the work described <br />• above by December 20, 1989. <br />Addendum for Work Completed in 1990 <br />All backfilling, grading and topsoil replacement has been <br />completed for the disturbed area. Vegetation is taking hold and <br />Phase 1 bond release was granted in May of 1991. <br /> <br />68 <br />