Laserfiche WebLink
• 2.05 APPLIC7-TIDi~I FCII2 PERNII'P a~oat 8 Oat ' <br />1~~1 ItF]QiTII~+]QTtB E~ OPF~tATI~i A1~ID <br />2.05.4 Reclamntiaa Plan. <br />(2) (d) (Cont'd.) <br />~~ ACPIVITIE9 - <br />f PiAI~B. <br />The brown sandstone and gray sandstone materials excavated fxYmt the rock <br />slope portals and entries would be utilized as Dover over less suitable <br />materials. OOVOC conservatively estimates that at least 30 percent of the <br />fill surface world be soil size particles and the remairrler would be <br />ooaxc.,e fragments less than 24-inches in rliamater. The Division has agreed <br />to allow QOVOC to pursue revegetation of the fill outslopes without the <br />addition of imported soils. OWOC would monitor the success of <br />revegetation and erosion cnnttvl over a 2-year period. <br />In accordance with Idrle 4.14.6(1), if any rillisg or gullying deeper than <br />9 inches occurs during the first growing season, the rills and gullies <br />would be filled, graded, seeded and mulched. If, after the second gracing <br />season, revegetation and erosion control are not successful, i.e. rills <br />and gullies 9 inches or deeper have formed and no vegetation has become <br />established, CX7~70C would add an average of 6 inches of soil Dover to the <br />fill outslcrpes arri reseed, fertilize, aryl mulch. <br />• Soils may be obtained fmn a stocl~ile at the Steven's Gulch wellfield, <br />fxoin excess soils excavated at the West or Fast Ridge Waste Rock Disposal <br />Areas, or piirrhac~ fxtan an outside sourue. Suitability analyses of the <br />soils utilized world be subtaitted for the Division's approval. The slopes <br />would be hydrrnarlrhed or would be straw mulched at a rate of 2 tons per <br />acre aryl tackified or covered with erosion control netting. <br />CWCC would increase the reclamation bond to cover the cost of applying <br />additional soils and revegetating the fill slopes should the 2-year trial <br />period prove unsuooessful. <br />IPSS than half an acre would be distributed by the ventilation shaft and <br />fan construction located north of the OVLd+I water tank. Only the minimum <br />area for the constnrction, aryl o~liance with MSF1A >~,~ ations, would be <br />cleared of Vegetation. 'Ihe site is located on the northern perimeter of <br />the area previously disturbed by the bn>rstr crushing habitat improvement <br />treatment and would rern ' little additional clearing. &~sed on the OVWM <br />soils analyses (Soils Appendix, Voltimie 9) , approximately 32 inches of this <br />Delson soil world be salvaged fratt the <br />Revised 08/02/90 <br />63 <br />• <br />