Laserfiche WebLink
<br /> <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM -EQUIPMENT MOBILI2AT ION / DEMOBILIZATION <br />Task #. .. 8 Prep. by RCO Filename..M039-8 <br />___-________ ________ __________ <br />Date..... 04-Aug-97 Permit # M-78-039 Mine......St. Jude Mine <br />____________ ________ _____________ <br />Permit Action........ Final Reclamation <br />_________________________________________ <br />Task Description..... Mobilization of Equipment <br />HOURLY EQUIPMENT COST <br />____________________ _ NOTE - This is a list to select from, not a list of mandatory items to inc lude. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVY, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highuay light duty truck, 4x2, 130 hp, 1/2 ton rating, gasol ine powered <br />-Hyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br />-Fuel Truck bx4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck bx4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GVY, 175 HP, diesel powered <br />Last Update: ________________________________ __________ ______________________ __________ ___________ <br />December, 1994 <br />--------------- Lt. Rig Med.Ri9 Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: c=28 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />----------------- <br />Ownership Cost/hr --------- <br />= 527.88 --------------------------------- <br />531.23 538.36 51.81 ---------- <br />519.89 ---------------------- <br />56.95 ----------- <br />512.79 ---------- <br />55.71 <br />Operating Cost/hr = 526.84 529.29 534.27 58.12 523.40 518.53 524.52 56.00 <br />Operator Cost/hr = 521.40 522.03 522.03 521.24 520.86 521.24 521.24 521.24 <br />Helper Cost/hr = 520.60 521.24 521.24 50.00 50.00 50.00 50.00 50.00 <br />Total = 596.72 8103.79 5115.90 528.17 564.15 546.72 558.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description <br />_________________________ (tons) Cost/hr Lost/hr <br />____ (no. hauled) Cost/hr Cost/hr Cost/ea <br />_____ <br />Cat D9N Dozer w/ ripper __________ <br />47.00 ___________ <br />548.37 _______ <br />_ <br />5103.79 ___________________________ <br />1 5152.16 _______________ <br />5103.79 ___________ <br />50.00 <br />Tractor w/ reveg implements 13.00 520.00 596.72 1 5116.72 596.72 50.00 <br />-----------------------Subtotals-.-------5268.88 -------5200.51--------50.00 <br />