Laserfiche WebLink
<br />ESTIMATING FORM -RENEGE TATI ON UORK cont'd <br />______________________ Filename M039-7 <br />________ sheet 2 of 2 <br />___ <br />B. __________ <br />SHRUB 8 TREE TRANSPL ANTS <br />___ _____________________ ____ ( MATERIAL: PLANTING: ~ E/PERT. ~ TOTAL I TOTAL <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE & SIZE ~ E/PLANT ~ E/PLANT ~ PELLET ~ E/PLANT I S/ACRE <br />No transplants requi red ~ ~ ~ ~ ~ ~ 80.00 <br /> Total transplant cost/acre: 80.00 <br />C. <br />___ SEEDBED PREPARATION <br />____________________ =___________ <br /> Tilling method #1: disc harrowing •• 896.60 <br /> #2: <br />D. FEED APPLICATION Total cost/acre: 896.80 <br /> Seeding method: drill seeding • To[al cost/acre: 860.23 <br />E. FERTILIZING <br />__ _____________ FERTILIZER / SOIL AMENDMENT ~ UNITS/ACRE ~ UNIT I E/UNIT I E/ACRE <br /> Materials used #1: No fertilizer/amendments required ~ ~ ~ ~ 80.00 <br /> #2: <br /> #3: <br /> Total materials cost/acre: 80.00 <br />Application method #1: No fertilizer application required <br />#2: <br />F. MULCHING <br />MULCH / NETTING / OTHER MATERIALS <br />Materials used #1: No mulch materials required <br />#2: <br />#3: <br />#4: <br />50.00 <br />Total application cost/acre: 80.00 <br />UNITS/ACRE I UNIT I E/UNIT S/ACRE <br />80.00 <br />Total materials cost/acre: 80.00 <br />Application method #1: No mulch application required <br />#2: <br />#3: <br />G. JOB COST <br />80.00 <br />Total application cost/acre: 50.00 <br />Total area to be seeded: <br />_ <br />_ 4. <br />_ <br />_ <br />_ <br />___ 25 <br />___ acres. Total 8/acre 5261 <br />_ <br />_ <br />_ <br />__ <br />_ .21 <br />_ <br />_ <br />_ Total Initial Job Cost= <br />_ 51,110. <br />________ 13 <br />__ <br />Estimated _ <br />_ <br />failure rate: <br />__ _ <br />_ <br />_ <br />25. <br />______ OO:G <br /> <br />___ of area. Total E/acre <br />• _ <br />_ <br />_ <br />_ <br />_ <br />8164 <br />______ _ <br />_ <br />_ <br />.41 <br />___ <br />Total ~ 9 Costs <br />Reseedin = <br />_ 8174. <br /> <br />________ 68 <br /> <br />__ <br /> __ ______ ___ <br />• Reseeding cost <br />items: A D ______ ___ <br />GRAND <br />TOTAL JOB COST = <br />81,284. <br />81 <br />